Clean the threads.
Remove old sealant, oil and debris. Make sure the mating threads are clean and dry.
BEOWELD / How to use
Identify the sealing surface, follow the application steps, and keep the checklist with your toolkit.
The BEOWELD fitting check
Some threads make the seal. Others simply tighten a nut around an olive or washer. Identify the sealing surface before choosing a sealant.
Before you buy
BEOWELD Liquid PTFE is for suitable metal-to-metal connections that seal at the threads. Choose your connection to see what to check next.
Read the five-point checklistA fitting can have different types of connection at each end. Check the exact joint you’re working on and its manufacturer’s instructions. If you cannot identify the sealing surface, get advice from a qualified installer before proceeding.
Learn how these seals work: compression fittings — Beswick Engineering · push-fit connections — John Guest.
Application basics
Start with a suitable metal threaded joint. A careful application matters just as much as choosing the right sealant.
Remove old sealant, oil and debris. Make sure the mating threads are clean and dry.
Apply a thin, continuous bead to the male thread.
Assemble the fitting and tighten as required, following its manufacturer’s instructions. Wipe away excess sealant.
Allow curing time before pressurising the system. See the pack guidance for cure times.
This is an overview. Read the product label and safety information before use, and check suitability for your fitting and application.
BEOWELD / A guide to keep
Keep this checklist handy for your next suitable metal threaded joint. No email needed.
Confirm the joint seals at its mating threads, rather than an olive, washer, gasket or O-ring.
BEOWELD Liquid PTFE is for suitable metal-to-metal threads. Check the fitting and product instructions for your application.
Check for damage. Remove old sealant, oil and debris, and make sure the mating threads are clean and dry.
Apply a thin, continuous bead to the male thread at an ambient temperature of 5–50°C. Follow the fitting manufacturer’s assembly procedure. Wipe away excess.
Follow the product instructions before putting the joint into service, then check it using the system’s prescribed test procedure.
This checklist is an overview, not a substitute for the product label, safety information or fitting manufacturer’s instructions. If you are unsure about the joint or application, ask a qualified installer.